Intercounty Connector now open to I-95; toll free preview through Dec. 3

MARYLAND ROUTE 200Maryland Intercounty Connector opens to Laurel – Dr. Gridlock, The Post
I-270 to I-95 takes 20 min. on ICCWTOP The newest portion of the Intercounty Connector (MD 200), between MD 97 Georgia Ave. and Interstate 95 opened this morning. While a connection to US 1 near Laurel remains to be completed, the bulk of the road and critical I-95 to I-270 link is now operational.

It is unclear from the previous articles if the toll free preview that runs through December 3 is for just the new section or the entire roadway. I’ll try to figure that out later today.

2 Comments

Add a Comment