Intercounty Connector now open to I-95; toll free preview through Dec. 3

MARYLAND ROUTE 200Maryland Intercounty Connector opens to Laurel – Dr. Gridlock, The Post
I-270 to I-95 takes 20 min. on ICCWTOP The newest portion of the Intercounty Connector (MD 200), between MD 97 Georgia Ave. and Interstate 95 opened this morning. While a connection to US 1 near Laurel remains to be completed, the bulk of the road and critical I-95 to I-270 link is now operational.

It is unclear from the previous articles if the toll free preview that runs through December 3 is for just the new section or the entire roadway. I’ll try to figure that out later today.

2 comments on “Intercounty Connector now open to I-95; toll free preview through Dec. 3”

  1. Michelle

    Yes, the newest portion of the Intercounty Connector (MD 200), between MD 97 Georgia Ave. and Interstate 95 was opened this morning.

    How long would it take to add it to http://maps.google.com ?

    Michelle

Leave A Reply